Size: 42/44
You will need: 600 g of gray-brown yarn Pico Lana Grossa (100% cotton, 115 m / 50 g); hook № 3,5; 6 buttons.
The offset pattern of shells A: the number of abstentions. n. a multiple of 12 + 1 + 3 abstentions. n. lifting. Knit according to the scheme A.
Starting with a series of Air. n., and lifting the loop before the 1st arrow, repeat repeat loop, finishing loops after the 2nd arrow.
Groups Art. s / n = shell in the 3rd and 6th p., and Art. b / n in the 4 th and 7 th district. Knit in the Air. n. the previous p.
Run 1 times 1 st - 8 th district, repeat 3rd -. 8th district.
The offset pattern of shells in: the number of abstentions. n. a multiple of 12 + 9 + 3 abstentions. n. lifting.
Knit as the displaced pattern of shells A, but the scheme B.
The density of knitting: 2 rapport and 9 p. pattern of ectopic shells, a hook № 3,5 = 13 x 10 cm. Tip: be sure to make a sample.
It must match the specified density knitting, otherwise adjust the hook.
BACK:
Assign a chain of 85 abstentions. n. + 3 abstentions. n. lifting. Knit pattern of displaced shells A, with 1 st Art. s / n 1, p. perform the 5th Air off the hook. n. = 7 shells in the 2nd district.
After 65 cm = 58 p. subtract from the beginning of the work on both sides for armholes (beginning on p. knit Comm. v., at the end of p. left) as n. to p. It began with the 1 st arrows in the figure and end symmetrically. After 17 cm = 15 p. from the beginning of armholes finish the job.
LEFT shelves: Assign a chain of 45 abstentions. n. + 3 abstentions. n. lifting. Knit pattern of displaced sinks in, with the 1st st. s / n 1, p. perform the 5th Air off the hook. P. Scheme B shows the full width of the ledge. Armhole to perform a right hand, as for the backrest. After 3 cm p = 3. from the beginning of the armhole to neckline leave from the left side 1 rapport, then subtract 6 p. still half rapport.
We recommend to make the pattern from paper to full size, and to control the applying thereto a knitted item.Work to finish on the back height.
Right front: Knit symmetrically.
SLEEVES: Assign a chain of 61 abstentions. n. + 3 abstentions. n. lifting. Knit a displaced pattern of shells A, with 1 st Art. s / n perform the 5th Air off the hook. n. = 5 shells in the 2nd district. Through 51.5 cm = 46 p. from the beginning of work on both sides to make a mark. After 4.5 cm = 4 p. of marks to finish the job.
ASSEMBLY PARTS Cardigan:
Run the seams, sew sleeves to marks.
Neckline tie 1 p. Art. b / n and 1 p. "Rachego step" = Art. b / n from left to right.
The edges of shelves tie 5 p. Art. b / n, with on the right shelf in the 3rd district. uniformly perform 6 holes for the buttons, the bottom - at a distance of 25 cm from the edge, the top - at a distance of 1 cm from the edge. For each hole on the 1 st. b / n perform 1 abstentions. P.
Nabornye end sleeveless also obvâzatʹ 1 r. dot.Sew sleeves. Sew on buttons. source
Welcome to Tina's handicraft , here you will find knitting and crochet for all family . 👉Αll designs are free, because everyone has the right to learn and create.👈 Inspired and crafted with my love of nature and the outdoors in mind. I always aim for comfort, warmth and versatility, timeless pieces that layer well and go with everything. I always create trying to pay close attention to detail, making every pattern design unique and filled with love and personality all their own ♥ .